Monday, September 30, 2013

week 7-- 9/30 start

Week 7


9/30- For this week, our goals are to build the basic body for tetrix robot in Solidworks, build the body for the tetrix robot, attach all 4 wheels, and make the robot to be able to drive.
     


some of the parts we will use for building the robot. Most from www.3dcontentcentral.com



Jack and Mikie building

   
  

Monday, September 23, 2013

Week 6


9/23 - Our goals are to catch up with the weeks for the blog, come up with a strategy for the FTC robot challenge, and start building the robot. A new member joined, Andrew, so we will have to create a page for him under team information.

Our new team member.

We decided to take a team photo because of the new member. Martin wasn't in it because he was taking the photo... 

9/27-  We finished on catching up on the blog weeks, but we still have to include a few photos. Our main focus will be making sure it can hang for the points at the last 30 seconds of the game. We have several ideas for gaining point during the middle of the game, and we have yet to see which one will work the best. We gathered all the parts for it and are ready build Monday. Also, we have created a page for Andrew.


Andrew's webpage. Check it out here, or by clicking on his page under team info.




Monday, September 16, 2013

Week 5


9/16- - Our goals are to create the blog, team profiles for each team member on our blog. We want the profiles to include information about each member, and a picture.Next, we want to start working on the weeks of the blog we were missing if there is time left. 

blank blog without anything on it

                                               Martin writing down team information

9/20- We succeeded at making the blog and the bios for everyone on the blog, but we failed at starting to work on the weeks we were missing. 

The website you're viewing now!


list of bios for team members






Monday, September 9, 2013

Week 4


9/9-  This week, we plan on finishing up the power point and                 presenting it. Most people are doing well on theirs, and it's             starting to look very nice. We will most likely finish up by             tomorrow. 
Getting ready to present the slides
     

A peek of Martin's slide

9/13-  We were successful at creating the power point for our   team,but the power point was later deleted so we had to present using the presentation from the second period engineering class. Everyone was really disappointed because we all worked hard on them. :(


This is the page that appeared when we tried to access the power point on Google drive.

google... failed us :(

Second period's presetation


Monday, September 2, 2013

Week 3


9/2- NO SCHOOL

9/3- Our goals are to watch the FTC challenge, and get teams together. We were all assigned a section of the rules to make a presentation on. 

FTC 2013-2014 video

FTC field

9/6  - We accomplished our goals, we all started working on the             rules on Friday, and got our team together.

Matthew intensely taking notes on the rules before typing them up


Martin working on his presentation